PLTS 5 MW Alas-Sumbawa

 

PT EHA has been developing a 5 MW capacity Solar Power Plant (Pembangkit Listrik Tenaga Surya = PLTS) from 2013 to 2018. PT EHA has MOU/ Development Support Letter from PLN NTB Region, complete legal permit, land ownership on behalf of PT EHA, Feasibility Study and Interconnection/Grid Impact Study verified and approved by PLN Region Nusa Tenggara Barat (NTB), Environmental Permit / UKL / UPL. PT EHA offers cooperation on the acquisition scheme to be able to complete PLTS 5 MW within 9-12 months after getting PPA from PLN. According to the price of BPP  2017, the rate for the system is USD 14.87 cent per kWh.

BUSINESS COOPERATION OFFER :

PT EH has already been pre-qualified by Central/ Regional PLN (Pusat/Wilayah) as DPT (Daftar Pengembang Terpilih) for NTB region.

PLTS Alas Sumbawa 5 MW is one of 14 renewable power plant will be processed for PPA DECEMBER 2018  by ESDM Ministry http://www.dunia-energi.com/pemerintah-kejar-kesepakatan-kontrak-jual-beli-listrik-14-proyek-ebt-tahun-ini/

 

Summary of legal DATA / license/ permit sumbawa :

1.Letter of Approval of Electricity Investment in Sumbawa Regency (671.24 / 019 / Ekon / 2017)

2.Letter of Support of PLTS in Sumbawa Regency to Minister of Energy (977/628 / Bappeda / 2017)

3.Letter of Direction of Land Conditioning (670/160 / BPMPTSP / 2017)

4.Space Conformity Recommendation Letter (650/133 / BKPRD / 2017)

5.Survey License and Data Collection (0044 / EPI.00.04 / WIL.NTB / 2017)

6.Letter of Support for PV Solar Development in NTB Province (0144 / STH.00.01 / WIL.NTB / 2017)

7.Environmental Permit

8.Letter of Recommendation UKL-UPL (009/4098 / DLH / 2017)

9.Interconnection Study Verification Letter by PT PLN  (0010 / DAN.01.01 / WIL.NTB / 2018)

10.Principle Permit (8/5204 / PI / PMDN / 2018)

11.Land Acquisition Letter (671/270 / XI / ALBA / 2017)

 

Development Progress of sumbawa PROJECT, process ppa in 2018 :

1.

PROJECT FEASIBILITY STUDY OR KKP BY PLN NTB

NEARLY FINISH TO PPA PROCESS

2.

Topography Works

Done

3.

Geological Works (include investigation on land)

Done

4.

Hydrology and Climatology Works

Done

5.

Kajian Upaya Pengelolaan Lingkungan Hidup dan Upaya Pemantauan Lingkungan Hidup (UKL-UPL)

Verification & Approval Letter from Dinas Lingkungan Hidup Sumbawa Regency

6.

Studi Penyambungan (Interconnection Study)

Verification & Approval Letter from PLN Regional NTB

7.

Landscape Design (include Power House)

Done

8.

Detail Engineering Design (DED)

Done

9.

Kajian Kelayakan Operasi dan Kelayakan Finansial (KKO-KKF)

Done

10.

Feasibility Study

Done